Crossing the River on Moving Day: Bridges, I-95/I-295 Work, and an Hourly Move
Moving across the St. Johns? How the Buckman work, the I-95/I-295 North project, and bridge closures affect an hourly Jacksonville move.
7 min read · Jacksonville, Florida
By Jawad · Published

Most cities don't have a river cutting them in half. Jacksonville does. The St. Johns runs right through town, so a move from Orange Park to Mandarin, from the Southside to Riverside, or from Arlington to the Northside means getting a loaded truck across one of a handful of bridges.
On an hourly move, that matters. Our shop is on St. Johns Industrial Parkway on the Southside, and the river is part of nearly every day we work. This post covers how the crossings affect your move and how to plan around road work.
Roadwork sources checked November 16, 2026. The closure schedules below come from FDOT District 2's November 14–20, 2026 report, issued November 13 (PDF). They describe scheduled work for that week, not a guarantee of conditions on moving day. Schedules change with weather and conditions, so use the latest weekly report and FL511's live map for your actual move date.
Why the river matters on an hourly move
Most local moves are priced by time in some form. Florida's consumer agency lists hourly rates among the things a moving price can be based on, and Florida's moving law lists "waiting time" as an accessorial service a mover can charge for.
Here's the simple arithmetic. If a three-person crew sits in a 30-minute backup, that's an hour and a half of crew time. It doesn't take a disaster. One lane closure on a bridge at the wrong hour will do it.
The river crossings people use most include:
- Buckman Bridge (I-295), between Orange Park and Mandarin
- Fuller Warren Bridge (I-95), near downtown and Riverside
- Acosta and Main Street bridges, downtown
- Hart and Mathews bridges, east of downtown toward the Southside and Arlington
- Dames Point Bridge (I-295 East Beltway), between Arlington and the Northside
- Shands Bridge (State Road 16), well south, between Clay and St. Johns counties
When one of these backs up, the detour is rarely around the corner. Check the official detour and whether it suits your loaded truck rather than assuming the next crossing will save time.
The crossings we use most, and when we avoid them
There's no single best bridge. The right crossing depends on where the move starts and ends, the time of day, and that week's closures. As a rule we try to avoid putting a loaded truck on a downtown or interstate crossing at rush hour, and we check the week's closure report for every route before moving day, because a detour across this river is rarely short.
Buckman Bridge (I-295): Orange Park, Fleming Island and Mandarin moves
The Buckman carries I-295 between Clay County and Mandarin, so it is on the route for most Orange Park, Fleming Island and Mandarin moves. FDOT's November 14–20, 2026 report (PDF) lists two Buckman-area entries:
- I-295 West Beltway (Buckman Bridge) from Park Street to San Jose Boulevard (Express Lanes): nighttime lane closures Sunday through Thursday, 9 p.m. to 5 a.m., for bridge work.
- I-295 West Beltway from Park Avenue (U.S. 17) to the Buckman Bridge: nighttime lane closures Sunday through Thursday, 9 p.m. to 6 a.m., for road work.
What it means for you: that week, the listed Buckman work is overnight. It does not announce a daytime closure, but it can affect evening or after-hours moves between Orange Park, Fleming Island and Mandarin. Check the latest report and FL511 before choosing a route for your own date.
I-95/I-295 North interchange: Northside and airport-area moves
The other big job on the map is FDOT's I-95/I-295 North Interchange project. According to FDOT's project page, checked November 16, 2026:
- It's a $176.8 million project that started in November 2016, with expected completion in early 2027. This is an estimate, not a guaranteed finish date.
- It adds a collector-distributor system so I-295 traffic can get through the interchange with fewer lane shifts, along with auxiliary lanes and ramp improvements on I-95 and at the Airport Road interchange.
- The Cole Road bridge over I-95 is being replaced, and there's bridge and ramp work on I-295 North and U.S. 17.
- FDOT says temporary lane closures and nighttime detours will take place through the project, at off-peak times.
Here's the part that matters for a daytime move. The November 14–20 report lists these schedules under the interchange project:
- I-95, Max Leggett Parkway to Busch Drive: daytime lane closures on weekdays, 7 a.m. to 3 p.m.
- I-295 West Beltway, Pulaski Road to Biscayne Boulevard: daytime lane closures Monday through Thursday, 7 a.m. to 3 p.m., plus a nighttime eastbound lane closure Monday, 10 p.m. to 5 a.m.
- I-295 West Beltway, Pulaski Road to U.S. 17: a nighttime westbound ramp closure Tuesday, 10 p.m. to 5 a.m., with a detour.
The daytime hours overlap a normal moving day. These schedules apply to that one week, not every week until the project is finished.
What it means for you: if your move touches the Northside, the airport area, or the I-95/I-295 North interchange on a weekday, plan for slowdowns, and tell us both addresses exactly so we can plan the route.
Other closures worth knowing
These entries appear in the same November 14–20 report:
- Main Street Bridge: FDOT lists a continuous southbound lane closure, plus the southbound pedestrian walkway, through Jan. 30, 2027, for bridge work.
- Shands Bridge (State Road 16): nighttime eastbound lane closures Sunday and Monday, 10 p.m. to 5 a.m., and Thursday and Friday, 11 p.m. to 5 a.m., for bridge work.
- Downtown event closures: daytime road closures Saturday, 8 a.m. to 10:30 a.m., on parts of the Main Street Bridge, the Acosta Bridge, Riverside Avenue and the Fuller Warren shared-use path for a permitted event.
Best start times by route
We don't have a magic hour for every route, but the pattern holds across town: an early start keeps the crew loading while traffic builds, and the goal is to make the river crossing outside the morning and evening rush. If your route touches a crossing with scheduled daytime work that week, like the I-95/I-295 North closures above, tell us, and we'll factor it into the start time we suggest.
How we quote travel time
Every mover handles travel time a little differently, which is why it should be spelled out on paper. Florida law requires a written estimate with an itemized breakdown of all costs before any work starts. Whoever you hire, ask these questions:
- When does the clock start, at our shop or at your door?
- Is the drive between your old home and your new one billed by the hour?
- Is there a separate travel or trip charge?
- How is waiting time handled if the truck is stuck in a closure?
- Is there a minimum number of hours?
Ask us these same questions. Your written estimate should answer every one of them in plain terms before you sign, and if it doesn't, we'll walk you through it.
What a slowdown actually looks like
A crash or a surprise lane closure on a bridge doesn't care how well a move was planned. When it happens, the choice is to wait it out or take a long detour, and either one costs time. The best protection is the boring stuff: an early start, a route checked the night before, and a written estimate that tells you how travel and waiting time are handled, so a backup is never a billing surprise.
Check FL511 the night before
Road work schedules change week to week, and weather and crashes don't follow a schedule at all. The night before your move, and again before departure:
- Check FL511's live map and alerts. FL511 shows closures, construction, incidents and cameras in real time. It is a live service, not an archive of the week's scheduled work, and the absence of a prominent alert does not prove a bridge is clear.
- Skim FDOT District 2's latest weekly closure report, which lists closures by county and road. The fixed November 14–20 PDF linked above records the schedule used in this guide; the latest-report link changes as FDOT issues updates.
- Follow FDOT District 2 (@MyFDOT_NEFL on X, MyFDOTNEFL on Facebook) for closure announcements.
- Call us if something big pops up. If a bridge on your route is down to one lane, we'd rather talk about start time or route the night before than in the truck.
FAQ
Does crossing the river make my move cost more?
On an hourly move, time in traffic is crew time, so a backed-up crossing can add to the total. How much depends on how your mover bills travel and waiting time, which should be itemized on your written estimate.
Is there work on the Buckman Bridge right now?
For November 14–20, 2026, FDOT's weekly report lists nighttime lane closures on the Buckman (Park Street to San Jose Boulevard, Express Lanes) and on the I-295 approach from U.S. 17, Sunday through Thursday nights. No daytime Buckman closure is listed that week. Check the latest FDOT report and FL511 for your move date.
When will the I-95/I-295 North interchange work be done?
As checked November 16, 2026, FDOT's project page lists expected completion in early 2027. That is an estimate. The daytime 7 a.m. to 3 p.m. closures above are from the November 14–20 report only; check the latest weekly report for later dates.
What's the best day to move across town?
It depends on the route and that week's closures. Check FDOT's weekly report, avoid days when a bridge on your route has a scheduled daytime closure, and ask your mover what start time they recommend.